Draft fact sheet — not an official government document
Navy Region Hawaii – Waipio Peninsula
partly verified Navy
Site page: https://dangerousmunitionsnearme.com/sites/navy-region-hawaii-waipio.html
This sheet: https://dangerousmunitionsnearme.com/sites/navy-region-hawaii-waipio-sheet.html
What is documented
Listed on EPA's current OB/OD facilities table as permitted, with a listed expiration of January 29, 2029. Hawaii DOH solicited public comment beginning August 15, 2024, on a draft five-year RAP permit renewal for continued controlled intentional detonations at the Waipio Peninsula Annex. This draft did not independently retrieve a final 2024–2025 RAP issuance. In 2015, DOH granted a 90-day State Emergency Hazardous Waste Permit on June 29, 2015, allowing up to 50 detonation events and no more than 15 pounds net explosive weight per event, to destroy munitions recovered from dredged material.
Known energetics or munitions types
The site is used to treat remediation-waste munitions recovered from dredging and construction-related activities at Joint Base Pearl Harbor-Hickam. A July 11, 2015 Navy release said recovered types from Pearl Harbor dredged-material screening included 5-inch projectiles, 4.5-inch barrage rockets and/or motors, 3-inch and 75mm projectiles, 60mm mortars, 40mm and 20mm projectiles and/or casings, grenades, a practice bomb, a TNT demolition charge, fuzes, and small-arms ammunition. A Hawaii Department of Health public notice dated August 15, 2024, on a draft five-year Remedial Action Plan permit renewal, would limit each detonation shot to no more than 16 pounds net explosive weight unless DOH approves a larger shot, and would cap annual treatment at 5,760 pounds net explosive weight per 365-day period. Those numeric limits are from the 2024 draft public notice, not from a final permit page retrieved in this pass.
Notable incidents
| Date | Verification | What is documented | Sources |
|---|---|---|---|
| 2015-07 | verified | Navy Region Hawaii announced scheduled controlled detonations July 14–31, 2015 (work had also occurred July 7–8) at the Confined Disposal Facility on Waipio Peninsula to destroy munitions recovered from screening of Pearl Harbor dredged material, under the June 29, 2015 emergency permit. The Navy said the project had previously treated some recovered munitions on Oct. 30, 2013, was suspended, and resumed in May 2015. | https://www.navy.mil/Press-Office/Press-Releases/display-pressreleases/Article/2262813/navy-controlled-detonations-to-occur-over-next-several-weeks-at-waipio-peninsul/ |
Prevailing wind
no wind rose sectors parsed
Sources
- EPA, Current Open Burning / Open Detonation Facilities (list last updated March 11, 2025; page also marked July 14, 2026)
https://www.epa.gov/hwpermitting/current-open-burning-open-detonation-facilities archived copy - EPA FRS facility coordinates for RCRA ID HIR000001115
https://gispub.epa.gov/arcgis/rest/services/OEI/FRS_INTERESTS/MapServer/8 archived copy - Navy, controlled detonations at Waipio Peninsula (July 11, 2015)
https://www.navy.mil/Press-Office/Press-Releases/display-pressreleases/Article/2262813/navy-controlled-detonations-to-occur-over-next-several-weeks-at-waipio-peninsul/ - Hawaii DOH public notice on draft five-year RAP permit renewal (published Aug 15, 2024)
https://statelegals.staradvertiser.com/2024/08/15/0001462891-01/ archived copy
Blank fields mean no source was found, not a zero or a no. This one-page sheet is a draft by D.A. Williams for local review only. It should not be mistaken for an official U.S. government document.