Draft fact sheet — not an official government document
Camp Minden (former Louisiana Army Ammunition Plant)
partly verified Other DoD
Site page: https://dangerousmunitionsnearme.com/sites/camp-minden.html
This sheet: https://dangerousmunitionsnearme.com/sites/camp-minden-sheet.html
What is documented
The main contained-burn disposal campaign was declared complete by the Louisiana National Guard on April 21, 2017; ESI was then to conduct about 30 days of cleanup, including burning residual debris, after which the chamber would not be used in that capacity again at Camp Minden. As of an October 24, 2018, Minden Press-Herald account of a Camp Minden Citizens Advisory Group meeting, 15 pounds of M6 were still reported in a bunker, the burn chamber was no longer in use and was up for sale, and Louisiana Military Department project coordinator Winston Matejowsky was quoted saying closure could not go on until that M6 was burned. This draft has not independently confirmed, from an official 2019–2026 source, whether those 15 pounds remain, were burned, or were otherwise disposed of.
Known energetics or munitions types
M6 propellant and clean-burning igniter (CBI) left from Explo Systems contractor storage of Army-origin material. These are HD 1.3 propellant/igniter materials, not primary explosives such as lead azide. A Louisiana National Guard release dated April 21, 2017, said the State of Louisiana contracted Explosive Service International on June 17, 2015, to destroy approximately 15,687,247 pounds of M6 and approximately 320,890 pounds of CBI, and that destruction of the M6 and CBI had been successfully completed in accordance with the contract. The Minden Press-Herald reported on October 24, 2018, that 15 pounds of M6 remained in a bunker thought too unstable to move. This draft did not find an official 2019–2026 confirmation that those 15 pounds were later destroyed.
Notable incidents
| Date | Verification | What is documented | Sources |
|---|---|---|---|
| 2012-10-15 | verified | Explosion of a magazine at Explo Systems, Camp Minden. EPA chronology: Louisiana State Police later identified about 10 million pounds of unsecured M6; the town of Doyline (about 400 homes) was evacuated during operational hours. | https://www.epa.gov/sites/default/files/2015-03/documents/1150056.pdf archived copy |
| 2013-06 | verified | Army Explosives Safety Board report cited in the EPA chronology: the probability of an explosives event related to long-term storage of M6 at Camp Minden was 'likely'; the Board recommended open burn/open detonation within two years. | https://www.epa.gov/sites/default/files/2015-03/documents/1150056.pdf archived copy |
| 2016-06-13 | verified | EPA approved a contained-burn system after tests showed 99.99% destruction of chemicals of concern, for about 16 million pounds of M6 and CBI. | https://www.epa.gov/archive/epa/newsreleases/epa-approves-contained-burn-system-camp-minden-disposal.html archived copy |
| 2016-09-29 | verified | About 120,960 pounds of CBI auto-ignited in an earth-covered magazine and destroyed the bunker. Louisiana National Guard reported no injuries. An Army Explosive Safety Technical Assistance Visit then advised that remaining CBI was too dangerous to handle and should be destroyed in place, with some magazines remotely ignited because entering them was not acceptable. | https://geauxguard.la.gov/2016/09/29/camp-minden-update-clean-burning-ignitor-combusted/ · https://geauxguard.la.gov/2016/10/14/explosives-experts-cbi-must-be-destroyed-in-place/ |
| 2017-04-21 | verified | Louisiana National Guard announced that destruction of approximately 15,687,247 pounds of M6 propellant and approximately 320,890 pounds of CBI had been successfully completed under the June 17, 2015, contract with Explosive Service International. Cleanup of residual debris was expected to take about 30 days. | https://geauxguard.la.gov/2017/04/21/update-camp-minden-m6-disposal-successfully-completed/ |
| 2018-10-24 | partly verified | Minden Press-Herald, reporting on a Camp Minden Citizens Advisory Group meeting: 15 pounds of M6 propellant remained in a bunker thought too unstable to move; the burn chamber was no longer in use and was up for sale; LMD project coordinator Winston Matejowsky was quoted saying the leftover should have been taken care of along the way and that the longer it was held the more likely it was to self-ignite. This draft did not find a later official confirmation of disposal. | https://press-herald.com/leftover-m6-causes-stir-at-meeting/ archived copy |
Prevailing wind
A 2016-2025 wind rose from the nearest Iowa Environmental Mesonet ASOS/AWOS station, Minden (MNE), 11.1 miles away. The most common wind is from the SSE (3.9% of non-calm observations in that sector). The rust arrow points downwind of that pattern. Calm was recorded 37.2% of the time.
This is a multi-year pattern of wind observed at the nearest airport or weather station, not a smoke or burn-day forecast. Wind at the munitions site can differ from the station. Direction is the direction the wind blows FROM, in the meteorological convention. Period: 2016-01-01 to 2025-12-31. Source: IEM wind rose for this station.
Sources
- EPA, Camp Minden chronology (Feb 13, 2015)
https://www.epa.gov/sites/default/files/2015-03/documents/1150056.pdf archived copy - EPA, contained-burn system approved (June 13, 2016)
https://www.epa.gov/archive/epa/newsreleases/epa-approves-contained-burn-system-camp-minden-disposal.html archived copy - Louisiana National Guard, CBI auto-ignition (Sept 29, 2016)
https://geauxguard.la.gov/2016/09/29/camp-minden-update-clean-burning-ignitor-combusted/ - Louisiana National Guard, CBI must be destroyed in place (Oct 14, 2016)
https://geauxguard.la.gov/2016/10/14/explosives-experts-cbi-must-be-destroyed-in-place/ - EPA FRS coordinates for RCRA ID LA0213820533
https://gispub.epa.gov/arcgis/rest/services/OEI/FRS_INTERESTS/MapServer/8 archived copy - Louisiana National Guard, Camp Minden M6 disposal successfully completed (April 21, 2017)
https://geauxguard.la.gov/2017/04/21/update-camp-minden-m6-disposal-successfully-completed/ - Minden Press-Herald, Leftover M6 causes stir at meeting (Oct 24, 2018)
https://press-herald.com/leftover-m6-causes-stir-at-meeting/ archived copy
Blank fields mean no source was found, not a zero or a no. This one-page sheet is a draft by D.A. Williams for local review only. It should not be mistaken for an official U.S. government document.