Camp Minden (former Louisiana Army Ammunition Plant)

partly verified Other DoD deep

Sector
Other DoD
Branch
Louisiana Military Department (Army National Guard installation; former Army ammunition plant)
Location
Minden, LA
EPA ID
LAR000101283
EPA listed name
STATE OF LOUISIANA MILITARY DEPT - CAMP MINDEN / U.S. ARMY LOUISIANA ARMY AMMUNITION PLANT
Type
storage, demil
On EPA OB/OD list
no
JMC demil hub (2025 briefing)
no
Permit status
Not on EPA's current OB/OD operating list
Permit expiration (as listed)
—
Latitude, longitude
32.530724, -93.432131
Last checked
2026-11-23

School and surface-water overlays load from a static extract within about 10 miles. Public water wells are not mapped.

EPA FRS RCRAINFO LA0213820533 (NAD83). Chosen over the Camp Minden address-matched point because FRS records interpolation-map with a 30-meter accuracy value.. INTERPOLATION-MAP; accuracy_value=30; reference: point where substance is released Map tiles © OpenStreetMap contributors (ODbL). School points are from NCES EDGE 2023-24 (public domain). Surface water is from EPA NHDPlus or, outside the conterminous U.S., the USGS National Hydrography Dataset (public domain).

NESW

Prevailing wind

A 2016-2025 wind rose from the nearest Iowa Environmental Mesonet ASOS/AWOS station, Minden (MNE), 11.1 miles away. The most common wind is from the SSE (3.9% of non-calm observations in that sector). The rust arrow points downwind of that pattern. Calm was recorded 37.2% of the time.

This is a multi-year pattern of wind observed at the nearest airport or weather station, not a smoke or burn-day forecast. Wind at the munitions site can differ from the station. Direction is the direction the wind blows FROM, in the meteorological convention. Period: 2016-01-01 to 2025-12-31. Source: IEM wind rose for this station.

Known energetics or munitions types

M6 propellant and clean-burning igniter (CBI) left from Explo Systems contractor storage of Army-origin material. These are HD 1.3 propellant/igniter materials, not primary explosives such as lead azide. A Louisiana National Guard release dated April 21, 2017, said the State of Louisiana contracted Explosive Service International on June 17, 2015, to destroy approximately 15,687,247 pounds of M6 and approximately 320,890 pounds of CBI, and that destruction of the M6 and CBI had been successfully completed in accordance with the contract. The Minden Press-Herald reported on October 24, 2018, that 15 pounds of M6 remained in a bunker thought too unstable to move. This draft did not find an official 2019–2026 confirmation that those 15 pounds were later destroyed.

Current status

The main contained-burn disposal campaign was declared complete by the Louisiana National Guard on April 21, 2017; ESI was then to conduct about 30 days of cleanup, including burning residual debris, after which the chamber would not be used in that capacity again at Camp Minden. As of an October 24, 2018, Minden Press-Herald account of a Camp Minden Citizens Advisory Group meeting, 15 pounds of M6 were still reported in a bunker, the burn chamber was no longer in use and was up for sale, and Louisiana Military Department project coordinator Winston Matejowsky was quoted saying closure could not go on until that M6 was burned. This draft has not independently confirmed, from an official 2019–2026 source, whether those 15 pounds remain, were burned, or were otherwise disposed of.

Notable incidents

DateVerificationWhat is documentedSources
2012-10-15verifiedExplosion of a magazine at Explo Systems, Camp Minden. EPA chronology: Louisiana State Police later identified about 10 million pounds of unsecured M6; the town of Doyline (about 400 homes) was evacuated during operational hours.https://www.epa.gov/sites/default/files/2015-03/documents/1150056.pdf archived copy
2013-06verifiedArmy Explosives Safety Board report cited in the EPA chronology: the probability of an explosives event related to long-term storage of M6 at Camp Minden was 'likely'; the Board recommended open burn/open detonation within two years.https://www.epa.gov/sites/default/files/2015-03/documents/1150056.pdf archived copy
2016-06-13verifiedEPA approved a contained-burn system after tests showed 99.99% destruction of chemicals of concern, for about 16 million pounds of M6 and CBI.https://www.epa.gov/archive/epa/newsreleases/epa-approves-contained-burn-system-camp-minden-disposal.html archived copy
2016-09-29verifiedAbout 120,960 pounds of CBI auto-ignited in an earth-covered magazine and destroyed the bunker. Louisiana National Guard reported no injuries. An Army Explosive Safety Technical Assistance Visit then advised that remaining CBI was too dangerous to handle and should be destroyed in place, with some magazines remotely ignited because entering them was not acceptable.https://geauxguard.la.gov/2016/09/29/camp-minden-update-clean-burning-ignitor-combusted/
https://geauxguard.la.gov/2016/10/14/explosives-experts-cbi-must-be-destroyed-in-place/
2017-04-21verifiedLouisiana National Guard announced that destruction of approximately 15,687,247 pounds of M6 propellant and approximately 320,890 pounds of CBI had been successfully completed under the June 17, 2015, contract with Explosive Service International. Cleanup of residual debris was expected to take about 30 days.https://geauxguard.la.gov/2017/04/21/update-camp-minden-m6-disposal-successfully-completed/
2018-10-24partly verifiedMinden Press-Herald, reporting on a Camp Minden Citizens Advisory Group meeting: 15 pounds of M6 propellant remained in a bunker thought too unstable to move; the burn chamber was no longer in use and was up for sale; LMD project coordinator Winston Matejowsky was quoted saying the leftover should have been taken care of along the way and that the longer it was held the more likely it was to self-ignite. This draft did not find a later official confirmation of disposal.https://press-herald.com/leftover-m6-causes-stir-at-meeting/ archived copy

Notes

Closest recent official parallel to IAAAP's 'cannot safely move it, destroy in place' finding, though the chemistry differs. The main tonnage was officially declared destroyed in April 2017; a reported 15-pound leftover in October 2018 is the remaining residual-holdings gap.

Sources

ZIP alerts Alerts coming soon

A later version may offer email notices when a tracked site near your ZIP has a newly documented incident, permit comment period, or sourced status change. That signup is not active. This form is disabled and does not collect, send, or store an email address or ZIP code.

See the privacy notice for what would be collected if alerts are turned on. Nothing is collected now.